Beijing Capital International Airport terminal 3 (Beijing T3 Airport), completed in December 2007, Beijing International Airport Terminal three expansion project is the 2008 Beijing Olympic Games focus on supporting the project, is a comprehensive transportation hub project is currently the largest and most complex domestic and asia. Construction area of about 900000 square meters, the new 99 seats; a new 3800 m long, 60 meters wide runway, the world's largest passenger aircraft Airbus A380 can also smooth landing. In addition, the new North cargo area, the corresponding supporting construction of the floor of the transportation system, as well as water, electricity, gas, oil supply, air guide, air base and other facilities.
Design concept
LED companies to take into account the advantages of energy saving and environmental protection, the original traditional lamps are replaced LED products, replacement to create a bright and comfortable environment, on the basis of the original increase illumination, do the basic anti glare control degree, and compared with traditional lamps, energy saving up to 60%.